Find it at the design gate,while it’s still a drawing.
We read every document on your project together and find the conflicts no single reviewer can see, while fixing them is still a drawing revision.
-
01
Send us the setWhatever the project has: reports, drawings, spreadsheets, even a photo of a plan.
-
02
Get ranked findingsMost serious first, each linked to the page it comes from.
-
03
See what’s missingSurveys and decisions the documents don’t contain, and who to ask for each.
-
04
Identify clashes and issuesShown in place on a measured model, and downloadable as engineering drawings.
More detail
How it works
We work from the documents the project already has. Nothing touches your systems. Every page is read and checked a second time against the original. Documents are compared wherever they talk about the same thing, and drawings are measured into a 3D model at checked scale. On the project below, that was 3,357 separate references, each traceable to its page.
One recent project
An operating public market in Australia, in early design. A competent team, and nothing had gone wrong yet.
Two new stairs were approved only if the car park was sprinklered. A separate pack proposed cutting those sprinklers. Nothing linked the two.
- 27
- findings
- 6
- critical
- 9
- gaps in the documents
- 13
- documents, nine authors
September 2026. None of the findings had yet cost anything. The document set is confidential, so it is described rather than linked.
What a finding looks like
Illustrative wording. The real documents are confidential.
New stairs S3 and S4 are acceptable on the basis that the basement car park is fully sprinkler protected.
Option 7: delete sprinkler system to basement car park.
CriticalOption 7 removes the condition the stair approval depends on. Neither document refers to the other.
What we find
- 01Documents that disagree
- One space promised to three different uses, each in a different consultant’s report.
- 02Savings that break approvals
- A cost cut in one pack that removes the condition another approval depends on.
- 03Out-of-date references
- Two current documents written against different editions of the building code.
- 04Clashes in the geometry
- A new layout sitting inside a vehicle path drawn years earlier.
Found now, it’s a drawing revision. Found on site, it’s rework, delay and a variation.
Next step
Got a project approaching a design gate?
Tell us about it. After we’ve talked, we’ll read its documents under a confidentiality agreement and show you what’s there.
Built on the $1.5B Ōtaki to North Levin alliance.